Dredger technical stop

As part of a planned technical stop, the largest dredger in France “Samuel de Champlain” was revised in dry dock at the Grands Ports maritime de Nantes/Saint-Nazaire. On all types of circuits and elements, Mecadam assistance accompanied the shipowner in its activities with high technical stakes and planning.